Tying the rooms together

Things are moving quickly with the renovation, as you can see in the photos at right, and our contractor has been great about keeping his crew busy. For example, when rain held up the delivery and installation of the trusses for the roof, he had them put up siding and install the plumbing. The fast pace is keeping me on my toes.

As I continue to sort out the electrical details for the studio, it’s time to address other issues, such as ordering interior windows and flooring, and coordinating the installation of each element with my contractor. Because the studio is only a portion of the overall remodel (which includes an in-law unit and garage), I have to balance my room’s needs with those of the overall project. Where it gets tricky is in coordinating each major installation, such as the insulation and sheet rock. My room has to be included with the rest of the house in order to keep the project on time and within budget. That means all of the little details that pertain to the studio have to be sorted out ahead of time. more

Digg Syndication Del.icio.us Syndication Google Syndication MyYahoo Syndication Reddit Syndication

1 Comment

Related Topics: Robair Report |